Construction Speed
Quick and Easy to install. That's not all.

Overview
Time is one of the most critical assets in the construction industry. The Speedfloor Suspended Concrete Flooring System is engineered to streamline the construction process—significantly reducing floor cycle times and accelerating overall project delivery. Its modular, prefabricated nature allows seamless integration with other trades and building systems, unlocking efficiencies beyond just the structural floor.
Objective
To illustrate how Speedfloor contributes to faster construction timelines, both directly through floor installation and indirectly by improving coordination across trades and reducing on-site congestion.
System Description
Speedfloor consists of lightweight galvanized steel joists topped with a concrete slab. The system is delivered to site pre-cut and ready to install, reducing on-site fabrication, labor, and propping requirements.
Speed Benefits Across Construction Phases
Rapid Floor Installation
Time Saved: Compared to traditional formwork, Speedfloor can be installed in a fraction of the time.
Method: Prefabricated steel joists are laid quickly by hand or light lifting equipment, often without the need for heavy cranes.
Minimal Propping
Impact: The self-supporting nature of the system in most cases eliminates the need for extensive temporary supports.
Result: Lower levels remain accessible for ongoing work, reducing delays between trades.
Early Access for Other Trades
Advantage: Services like plumbing, electrical, and partitioning can begin installation sooner thanks to faster floor completion.
Result: Overlapping workstreams reduces overall construction time.
Prefabrication & Just-in-Time Delivery
Process: Components are cut to size off-site and delivered as needed.
Benefit: Reduced on-site storage and preparation allow projects to maintain tighter scheduling and cleaner, safer sites.
Improved Site Efficiency
Effect: Less formwork, fewer workers, and lighter equipment reduce overall site congestion.
Outcome: More streamlined workflow, fewer delays, and easier quality control.
Case Applications
High-Density Residential Projects
Challenge: Tight build timelines in urban environments.
Solution: Speedfloor enabled faster floor cycles, reducing the overall build time by weeks.
Commercial Developments
Challenge: Strict tenant move-in deadlines.
Solution: Early trade access and reduced propping allowed parallel activities and improved project coordination.
Extensions & Retrofits
Challenge: Building within occupied sites or constrained spaces.
Solution: Lightweight components minimized disruption and enabled quick additions with limited downtime.
Key Advantages
Shorter Floor Cycles: Each level can be completed faster, typically within 1–2 days for installation and pouring.
Reduced Labor Hours: Smaller crews complete more work in less time.
Lower Equipment Dependence: No need for heavy formwork systems or large cranes.
Faster Occupation or Revenue Generation: Earlier project handover means earlier return on investment for clients and developers.
Conclusion
The Speedfloor Suspended Concrete Flooring System offers a critical advantage in today's fast-paced construction environment. Its design simplifies and speeds up the flooring process while enhancing coordination across the entire build. The result is faster delivery, lower overheads, and improved profitability for all stakeholders involved.